Overview: This week’s assignment is to create a work breakdown structure (WBS) f

By admin

Overview:
This week’s assignment is to create a work breakdown structure (WBS) for the project
you selected during Unit 2. This is part of your Course Project.
Instructions:
Create a high-level WBS comprised of at least three levels:
Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks.• Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means.• Level Numbering:o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc. Requirements:• Submit a Word document. • There is no need to use APA formatting for this assignmentBe sure to read the criteria by which your work will be evaluated before you write

Exit mobile version